Where Your Money Goes...

  1. Parks and Rec
  2. Police

August Improvements Update

 

District 1 Project Progress

Sandtown Park

 

Sandtown Park is receiving several renovations consisting of several projects including the replacement of existing damaged exterior blow grade waterproofing with new materials. Wall repair and below-grade drainage installation.

 

The interior of the gym walls and lower walls are being repaired, scraped with new waterproofing coatings being applied to the interior walls. Roofs above gym and administrative areas are being replaced as well with the basketball gym receiving a new HVAC system to address the need of needing one.

 

Summary of Sandtown Project

 

 

Task

Scope of Work/Observations

Status

Cost

Exterior Waterproofing

Replacement of existing damaged exterior below-grade waterproofing with new materials, wall repair, and below-grade drainage installation. New Waterproofing membranes were applied, and drainage completed

Completed

$31,600

Interior Waterproofing

Interior gym walls and lower walls are being repaired; scraped and new waterproofing coatings were applied to the interior walls. New Waterproofing sealant applied

Completed

$31,600

Replacement Roofing

Both roofs above gym and administrative area to be replaced. Roofing and Downspouts are completed

Completed

$375,793

Basement-level Exterior metal Doors

Replacement of exterior doors on the basement level, due to extensive damage. The vendor is ordering the replacement doors.

On Schedule

forecasted completion date of 05/2022

  $22,474

Gym HVAC

New HVAC system installation in the basketball gymnasium (does not currently have a system installed). ITB has been published

Contract Execution phase

$158,665

Mold Remediation & Exterior Wall Repair

Mold Remediation (addition to existing scope). Repair damaged exterior walls to prevent further water intrusion. Assessments in progress to identify the route and scope of work being developed

Assessment Phase

TBD

 

Recent Activities:

 

  • The downspouts replacement was completed.
  • Counter flashing throughout the roofing areas is complete.
  • The gutter has been fully replaced along the two sections' edges.
  • The new HVAC system will be procured through the current ITB.
  • The exterior metal doors on the basement level have been ordered.
  • Mold Remediation and Exterior wall repair Assessment in Progress


 

Sandtown Park's downspout replacement completed.

After

 

Trammel Crow

 

Trammel Crow received some new exercise equipment, and the restroom was repainted as well during the renovations. The exercise equipment replacement required the replacement of damaged equipment and the installation of a new foundation.

 

Summary of Trammel Crow Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Exercise Equipment

Replacement of damaged equipment with new exercise equipment, including new foundations.

Completed

$53,406

Restroom Repainting

Repainting of the restroom building

Completed

$0


District 2 Project Progress

Cliftondale Park/South Fulton Arts Center

 

Current renovation design plans for Cliftondale Park/South Fulton Arts Center are on track. Designs will detail upcoming renovations to be completed to this building complex.

 

Summary of Cliftondale Park/South Fulton Arts Center Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Renovation Design

Assess and design interactive space for the Art Center. Final design and cost estimate documents have been submitted and are under review by COSF Staff

Completed

$98,430

Renovation

The renovation will take place after the design is complete and awarded through ITB.

On Schedule

TBD

 

Recent Activities:

  • The final design and cost estimate documents are complete and under review for approval.

 

District 3 Project Progress

Welcome All Park Recreation Center 

 

Welcome All-Park Recreation Center improvements consist of replacing all major roofing systems above the gymnasium, main building, skylight above the pool, and metal roofing above the pool.

 

Wet glazing above the main hallways is also being repaired. Interior renovations to the building include repairing water-damaged ceilings, window replacements, and slide replacements.

 

Summary of Welcome All Park Recreation Center Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Gym and main building Roofing replacement

Replacement of gym and main building roofing systems above the gymnasium, main building. Replacement of Roofing is complete

Completed

$1,152,980

Wet Glazing

Wet glazing above the main hallways is to be repaired. Wet Glazing is complete, however evaluating change order for Parapet wall leaks

Completed

$64,913

Pool Skylight Replacement

Replacement of Pool Skylight. The replacement is scheduled to begin in March 2022 after the Main building reroofing is complete.

On Schedule forecasted completion date of 6/2022. Schedule could be impacted by pending outcoming of change order.

$449,308

Pool Metal Roofing Replacement

Replacement of pool metal roofing. The replacement is scheduled to begin in conjunction with Skylight replacement in March 2022

On Schedule forecasted completion date of 8/2022. Schedule could be impacted by pending outcoming of change order.

$1,254,387

Interior Renovation of ceilings, windows, and waterslide

Interior renovations to the building include the repair of water-damaged ceilings, window replacements, and water slide replacements.

Submittals have been approved by COSF and materials are being ordered. Some renovations are scheduled to take place in April 2022 while the rest are pending the completion of Roof replacement

On Schedule forecasted completion date of 10/2022. Pending the completion of the roofing replacement completion.

$351,379

  

Recent Activities:

  • The gym and main building roofing replacements are complete.
  • The wet glazing repairs are complete.
  • The vendor has pointed out leaks in the parapet wall above the glazing.
  • Pending change of order to repair the structural steel supporting the pool roofing.


Welcome All Park Aluminizer Coating AfterWelcome All Park Pool Area With Scaffolding

 After Aluminizer Coating                                       Pool Area With Scaffolding 


South Fulton Tennis Center

 

New work for South Fulton Tennis Center follows last years' Tennis Court replacements as the city is currently designing ADA Access Pathways from the building to the tennis court level.

 

Summary of South Fulton Tennis Center Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Tennis Court Replacement

Replacement of damaged tennis courts with new courts and fencing.

Completed

$557,500

ADA Access Pathway

Design and installation of an ADA accessible pathway from the building to the tennis court level

On Schedule forecasted completion date of 8/2022.

$297,948

 

Recent Activities:

  • ADA Access Pathway design and installation.

 

Delano Park Project Detail

 

Fencing around Delano Park was replaced.

 

Summary of Delano Park Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Fencing Replacement

Replacement of damaged fencing

Completed

$16,552

 

Recent Activities:

  • Fence replaced.

 

Canine Dog Park

 

The Canine Dog Park is getting some repairs to the restroom doors as new metal doors are replacing the old broken ones.

 

Summary of Canine Dog Park Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Restroom Door Replacement

Replacement of damaged restroom doors with new metal doors

On Schedule forecasted completion date 5/2022

$8,564



District 4 Project Progress

Wilkerson Mill Park

 

Wilkerson Mill Park renovations consist of replacing the joint Press Box and Concession Stand building roofing. The current roofing before the project was old and the fascia board was damaged. Interior renovation projects include drywall ceiling, water heater, window replacement, and a new HVAC. 

 

Summary of Wilkerson Mill Park Project

 

 

Area

Scope of Work/Observations

Comments

Cost

Press Box/Concession Stand Roofing

Replacement of the joint Press Box/Concession Stand building roofing and fascia board is complete.

Completed

$13,440

Interior Renovation

Interior renovation projects include drywall ceilings. The drywall repair has begun.

In Progress

$0

Window Replacement

COSF Staff is reviewing window submittals for approval. Pending Drywall ceiling repair completion

On Schedule forecasted completion date of 5/2022

$0

Water Heater and HVAC Unit Replacement

Replacement of Water Heater & HVAC system, Replacement pending completion of interior renovations.

 Assessment Phase

TBD

  

Recent Activities:

 

  • The drywall ceiling repairs are nearly complete.
  • The window replacements are pending the completion of roofing and drywall work.


 Wilkerson Mill Park Roof Before and After

Before                                                                               After

 

Wilkerson Mill Drywall Before and After              Before                                                                        After

 

District 5 Project Progress

Burdett Gymnasium

 

Renovations of Burdett gym consist of installing a new HVAC as it's currently missing one. Security cameras are being added to the parking lot and inside the facility to address safety concerns.

 

Interior renovations include installing a permanent partition for the technology lab and repairing damaged ceiling trim. 

 

Summary of Burdett Gym Project

 

 

Tasks

Scope of Work/Observations

Comments

Cost

Gym HVAC

Install a new HVAC system as it does not currently have one. This work is part of the published Burdett CDBG Grant ITB. The lowest bidder is in contract negotiations with COSF

On Schedule forecasted to be completed by 7/2022.

$235,000

Security Cameras

Security cameras will be added to the parking lot and inside the facility. The vendor is preparing submittals

On Schedule forecasted to be completed by 6/2022

$41,862

Interior Renovations

Interior renovations to Gymnasium include installing a permanent partition for the technology lab and repairing the damaged ceiling trim.

 

On Schedule forecasted to be completed by 5/2022

$24,362

 

Recent Activities: 

  • An HVAC system is a part of a current Burdett Gym CDBG Grant ITB. The low bidder is ordering materials.
  • The camera work is still scheduled to begin in the summer of 2022.
  • The interior renovations are now in progress.

 

District 6 Project Progress

Creel Park

 

Renovations around Creel Park include replacing roofing at two outdoor pavilions and an attached restroom building. Previous shingles are being removed and replaced. Future projects include upgrading the HVAC components at the community building and outdoor restrooms. 

 

Status Summary of Creel Park Project

 

 

Area

Observations

Comments

Cost

Large Pavilion Roofing

Replacement of the roofing at the two outdoor pavilions and attached restroom building. Large Pavilion roofing Complete

Completed

$16,298

Pavilion #2 Roofing

Replacement of the roofing at the two outdoor pavilions and attached restroom building. Pavilion # 2 roofing Complete

Completed

$10,865

HVAC Upgrades

Upgrading the HVAC components at community building and outdoor restrooms are completed

Completed

$26,976

 

Recent activities:

 

  • The HVAC installation is complete.