Where Your Money Goes...
August Improvements Update
District 1 Project Progress
Sandtown Park
Sandtown Park is receiving several renovations consisting of several projects including the replacement of existing damaged exterior blow grade waterproofing with new materials. Wall repair and below-grade drainage installation.
The interior of the gym walls and lower walls are being repaired, scraped with new waterproofing coatings being applied to the interior walls. Roofs above gym and administrative areas are being replaced as well with the basketball gym receiving a new HVAC system to address the need of needing one.
Summary of Sandtown Project
Task | Scope of Work/Observations | Status | Cost |
Exterior Waterproofing | Replacement of existing damaged exterior below-grade waterproofing with new materials, wall repair, and below-grade drainage installation. New Waterproofing membranes were applied, and drainage completed | Completed | $31,600 |
Interior Waterproofing | Interior gym walls and lower walls are being repaired; scraped and new waterproofing coatings were applied to the interior walls. New Waterproofing sealant applied | Completed | $31,600 |
Replacement Roofing | Both roofs above gym and administrative area to be replaced. Roofing and Downspouts are completed | Completed | $375,793 |
Basement-level Exterior metal Doors | Replacement of exterior doors on the basement level, due to extensive damage. The vendor is ordering the replacement doors. | On Schedule forecasted completion date of 05/2022 | $22,474 |
Gym HVAC | New HVAC system installation in the basketball gymnasium (does not currently have a system installed). ITB has been published | Contract Execution phase | $158,665 |
Mold Remediation & Exterior Wall Repair | Mold Remediation (addition to existing scope). Repair damaged exterior walls to prevent further water intrusion. Assessments in progress to identify the route and scope of work being developed | Assessment Phase | TBD |
Recent Activities:
- The downspouts replacement was completed.
- Counter flashing throughout the roofing areas is complete.
- The gutter has been fully replaced along the two sections' edges.
- The new HVAC system will be procured through the current ITB.
- The exterior metal doors on the basement level have been ordered.
- Mold Remediation and Exterior wall repair Assessment in Progress
After
Trammel Crow
Trammel Crow received some new exercise equipment, and the restroom was repainted as well during the renovations. The exercise equipment replacement required the replacement of damaged equipment and the installation of a new foundation.
Summary of Trammel Crow Project
Tasks | Scope of Work/Observations | Comments | Cost |
Exercise Equipment | Replacement of damaged equipment with new exercise equipment, including new foundations. | Completed | $53,406 |
Restroom Repainting | Repainting of the restroom building | Completed | $0 |
District 2 Project Progress
Cliftondale Park/South Fulton Arts Center
Current renovation design plans for Cliftondale Park/South Fulton Arts Center are on track. Designs will detail upcoming renovations to be completed to this building complex.
Summary of Cliftondale Park/South Fulton Arts Center Project
Tasks | Scope of Work/Observations | Comments | Cost |
Renovation Design | Assess and design interactive space for the Art Center. Final design and cost estimate documents have been submitted and are under review by COSF Staff | Completed | $98,430 |
Renovation | The renovation will take place after the design is complete and awarded through ITB. | On Schedule | TBD |
Recent Activities:
- The final design and cost estimate documents are complete and under review for approval.
District 3 Project Progress
Welcome All Park Recreation Center
Welcome All-Park Recreation Center improvements consist of replacing all major roofing systems above the gymnasium, main building, skylight above the pool, and metal roofing above the pool.
Wet glazing above the main hallways is also being repaired. Interior renovations to the building include repairing water-damaged ceilings, window replacements, and slide replacements.
Summary of Welcome All Park Recreation Center Project
Tasks | Scope of Work/Observations | Comments | Cost |
Gym and main building Roofing replacement | Replacement of gym and main building roofing systems above the gymnasium, main building. Replacement of Roofing is complete | Completed | $1,152,980 |
Wet Glazing | Wet glazing above the main hallways is to be repaired. Wet Glazing is complete, however evaluating change order for Parapet wall leaks | Completed | $64,913 |
Pool Skylight Replacement | Replacement of Pool Skylight. The replacement is scheduled to begin in March 2022 after the Main building reroofing is complete. | On Schedule forecasted completion date of 6/2022. Schedule could be impacted by pending outcoming of change order. | $449,308 |
Pool Metal Roofing Replacement | Replacement of pool metal roofing. The replacement is scheduled to begin in conjunction with Skylight replacement in March 2022 | On Schedule forecasted completion date of 8/2022. Schedule could be impacted by pending outcoming of change order. | $1,254,387 |
Interior Renovation of ceilings, windows, and waterslide | Interior renovations to the building include the repair of water-damaged ceilings, window replacements, and water slide replacements. Submittals have been approved by COSF and materials are being ordered. Some renovations are scheduled to take place in April 2022 while the rest are pending the completion of Roof replacement | On Schedule forecasted completion date of 10/2022. Pending the completion of the roofing replacement completion. | $351,379 |
Recent Activities:
- The gym and main building roofing replacements are complete.
- The wet glazing repairs are complete.
- The vendor has pointed out leaks in the parapet wall above the glazing.
- Pending change of order to repair the structural steel supporting the pool roofing.
After Aluminizer Coating Pool Area With Scaffolding
South Fulton Tennis Center
New work for South Fulton Tennis Center follows last years' Tennis Court replacements as the city is currently designing ADA Access Pathways from the building to the tennis court level.
Summary of South Fulton Tennis Center Project
Tasks | Scope of Work/Observations | Comments | Cost |
Tennis Court Replacement | Replacement of damaged tennis courts with new courts and fencing. | Completed | $557,500 |
ADA Access Pathway | Design and installation of an ADA accessible pathway from the building to the tennis court level | On Schedule forecasted completion date of 8/2022. | $297,948 |
Recent Activities:
- ADA Access Pathway design and installation.
Delano Park Project Detail
Fencing around Delano Park was replaced.
Summary of Delano Park Project
Tasks | Scope of Work/Observations | Comments | Cost |
Fencing Replacement | Replacement of damaged fencing | Completed | $16,552 |
Recent Activities:
- Fence replaced.
Canine Dog Park
The Canine Dog Park is getting some repairs to the restroom doors as new metal doors are replacing the old broken ones.
Summary of Canine Dog Park Project
Tasks | Scope of Work/Observations | Comments | Cost |
Restroom Door Replacement | Replacement of damaged restroom doors with new metal doors | On Schedule forecasted completion date 5/2022 | $8,564 |
District 4 Project Progress
Wilkerson Mill Park
Wilkerson Mill Park renovations consist of replacing the joint Press Box and Concession Stand building roofing. The current roofing before the project was old and the fascia board was damaged. Interior renovation projects include drywall ceiling, water heater, window replacement, and a new HVAC.
Summary of Wilkerson Mill Park Project
Area | Scope of Work/Observations | Comments | Cost |
Press Box/Concession Stand Roofing | Replacement of the joint Press Box/Concession Stand building roofing and fascia board is complete. | Completed | $13,440 |
Interior Renovation | Interior renovation projects include drywall ceilings. The drywall repair has begun. | In Progress | $0 |
Window Replacement | COSF Staff is reviewing window submittals for approval. Pending Drywall ceiling repair completion | On Schedule forecasted completion date of 5/2022 | $0 |
Water Heater and HVAC Unit Replacement | Replacement of Water Heater & HVAC system, Replacement pending completion of interior renovations. | Assessment Phase | TBD |
Recent Activities:
- The drywall ceiling repairs are nearly complete.
- The window replacements are pending the completion of roofing and drywall work.
Before After
Before After
District 5 Project Progress
Burdett Gymnasium
Renovations of Burdett gym consist of installing a new HVAC as it's currently missing one. Security cameras are being added to the parking lot and inside the facility to address safety concerns.
Interior renovations include installing a permanent partition for the technology lab and repairing damaged ceiling trim.
Summary of Burdett Gym Project
Tasks | Scope of Work/Observations | Comments | Cost |
Gym HVAC | Install a new HVAC system as it does not currently have one. This work is part of the published Burdett CDBG Grant ITB. The lowest bidder is in contract negotiations with COSF | On Schedule forecasted to be completed by 7/2022. | $235,000 |
Security Cameras | Security cameras will be added to the parking lot and inside the facility. The vendor is preparing submittals | On Schedule forecasted to be completed by 6/2022 | $41,862 |
Interior Renovations | Interior renovations to Gymnasium include installing a permanent partition for the technology lab and repairing the damaged ceiling trim.
| On Schedule forecasted to be completed by 5/2022 | $24,362 |
Recent Activities:
- An HVAC system is a part of a current Burdett Gym CDBG Grant ITB. The low bidder is ordering materials.
- The camera work is still scheduled to begin in the summer of 2022.
- The interior renovations are now in progress.
District 6 Project Progress
Creel Park
Renovations around Creel Park include replacing roofing at two outdoor pavilions and an attached restroom building. Previous shingles are being removed and replaced. Future projects include upgrading the HVAC components at the community building and outdoor restrooms.
Status Summary of Creel Park Project
Area | Observations | Comments | Cost |
Large Pavilion Roofing | Replacement of the roofing at the two outdoor pavilions and attached restroom building. Large Pavilion roofing Complete | Completed | $16,298 |
Pavilion #2 Roofing | Replacement of the roofing at the two outdoor pavilions and attached restroom building. Pavilion # 2 roofing Complete | Completed | $10,865 |
HVAC Upgrades | Upgrading the HVAC components at community building and outdoor restrooms are completed | Completed | $26,976 |
Recent activities:
- The HVAC installation is complete.